08. 01. 07Soil is imported to the North Parcel during Spring 2007, to prepare for the site’s remediation
08. 01. 07New Cure staff at work on the South Parcel repairing a landfill gas conveyance line
08. 01. 07A view of the vegetative landfill cover on the South Parcel’s “top deck” on in February 2006
08. 01. 07Landfill gas wells and collecter pipes on the OII Landfill's South Parcel_2-9-06
08. 01. 07A drill rig at work, installing a gas collection well
08. 01. 07Birds Nest on the South Parcel: The landfill is a home to a hawk and coyotes
08. 01. 07Regular testing is done on the landfill’s protective cover
08. 01. 07New Cure taking landfill gas concentration measurements at a gas well on the South Parcel
08. 01. 07A gas well and header lines on the top deck of the South Parcel, looking towards Los Angeles
08. 01. 07A drill crew at work installing a new landfill gas collection well on the South Parcel
08. 01. 07NCI repairing a “V-ditch” for the stormwater collection system
08. 01. 07As the landfill settles, New Cure is diligent about repairing the stormwater conveyance systems
08. 01. 07The storm water system was designed to settle, but sections are routinely maintained
08. 01. 07New Cure staff adjusting the level and height of the bench road gas conveyance lines
08. 01. 07NCI and drill crew install a new groundwater monitoring well
08. 01. 07NCI and drill crew install a groundwater monitoring well close to the 60 Freeway
08. 01. 07View of vegetative landfill cover and gas collection lines on “top deck” on spring day in Mar 06
08. 01. 07Groundwater monitoring wells on the northwest side of OII's North Parcel
08. 01. 07A technician prepares to conduct a geophysical test on the North Parcel in March 2007
08. 01. 07The Leachate Treatment Plant (LTP) treats landfill liquids and undergoes scheduled maintenance
08. 01. 07An NCI technician prepares to enter the landfill gas treatment system during regular maintenance
08. 01. 07Inside the 60 ft high landfill gas treatment system, landfill gas is combusted
08. 01. 07New Cure maintains soil piles on the North Parcel, which will be used during the final NP work
08. 01. 07New Cure crushed stockpiled concrete debris in 2006 in preparation for the NP remedy
08. 09. 07NCI installs landfill liquid collection wells at the west end of the South Parcel in 2007
06. 20. 08Bench road repairs are part of routine landfill maintenance
06. 20. 08NCI conducting routine weed abatement.
06. 20. 08Monocover repairs on the east end of the landfill.
06. 20. 08NCI conducts monocover repairs on the north slope of the South Parcel
06. 20. 08Slope repairs between 540S and Toe Buttress road.
06. 20. 08Applying Asphalt Rubber Aggregate Membrane (ARAM).
06. 20. 08Landfill Gas Treatment System CEMS
06. 20. 08Conducting routine monocover repairs.
06. 20. 08Confined space entry at Landfill Gas Treatment
06. 20. 08NCI field staff conducts routine weed abatement
06. 20. 08Electrical maintenance activities at the LFGTS
06. 20. 08Removing Lamson Gas Blower for repairs
06. 20. 08NCI conducts “downdrain” repairs on north slope of South Parcel
06. 20. 08Conducting storm drain repairs.
06. 20. 08Replacing a 24" expansion joint on gas line
06. 20. 08NCI makes regular repairs to “V-ditch”- ongoing collection of LFG and liquids causes settlement
06. 20. 08Replacing a lateral tie-in due to settlement
06. 20. 08NCI staff conducts maintenance on a gas and liquids collection well
06. 20. 08NCI conducts routine sampling as part of ongoing landfill maintenance
06. 25. 08Pressure grouting is part of routine maintenance in response to landfill settlement
08. 06. 08Backfilling near monitoring wells in the SCE slope area of the North Parcel
08. 07. 08A temporary access road was constructed to allow access to the South Parcel through the North Parcel